Baptist Road, Bethel Park, Whitehall -- Alternating one-way traffic as needed from Lowes Drive to Grove Road from 8 p.m. to 6 a.m. Monday-Friday nights through Sept. 3 during milling and resurfacing.
Beaver Grade Road, Moon --Alternating one-way traffic from 7 a.m. to 3:30 p.m. weekdays through Friday between Sharon Road and Parrish Drive for drainage work and restoration.
Bessemer Avenue, East Pittsburgh -- Alternating one-way traffic as needed from 7 a.m. to 3 p.m. daily through Aug. 27 at Route 30 bridge during installation of debris containment.
Bettis Road, West Mifflin -- Closed for bridge replacement between Ridgeview Drive and Paules Lane through late October. Detour posted.
Browns Hill Road, Squirrel Hill -- Single-lane traffic from 10 p.m. Friday to 6 p.m. Saturday.
Business Route 376 (former Business 60), Moon -- Single-lane traffic in both directions around the clock between the eastern interchange with the Parkway West and Airside Drive. Nightly lane closures from 8 p.m. to 6 a.m. from the Thorn Run/Coraopolis Heights Road interchange to just past University Boulevard, with one lane open in each direction. Around-the-clock single-lane traffic from University Boulevard to half-mile east of International Drive through late November.
Dorseyville Road, Indiana Township -- Closed between Indianola Road and Saxonburg Boulevard for total roadway reconstruction through late August.
Elizabeth Avenue, Avalon -- Closed from Route 65 to Howden Street around-the-clock through Sept. 4 as part of Route 65 project.
Forbes Road, Trafford -- Closed from Monday to Nov. 2 for replacement of bridge over Turtle Creek between Broadway Boulevard and Seventh Street Extension. Detour via Fifth Street Extension and Forest Avenue.
Fort Duquesne Bridge -- Southbound approach from Route 65 to inbound lower deck closed through 5 a.m. Aug. 30. On-ramps from Allegheny Avenue, Ridge Avenue and Reedsdale Street and off-ramps to Fort Duquesne Boulevard and 10th Street Bypass also closed until Aug. 30. Full inbound lower deck closures this weekend (Aug. 20) and next weekend (Aug. 27) from 7 p.m. Friday to 5 a.m. Monday. Traffic on inbound lower deck reduced to two lanes during weekday daylight hours and one lane from 7 p.m. to 5 a.m. nightly through Aug. 27. Off-ramp to Fort Duquesne Boulevard remains closed until Sept. 10.
Freeport Road, Harmar -- Eastbound traffic reduced to a single lane between Route 910 and the turnpike around-the-clock until late August as Equitable Gas contractor replaces 20-inch main.
Greentree Road, Scott -- Restricted to one lane eastbound at Scott Towne Center due to landslide.
Grubbs Road, McCandless -- Bridge over Pine Creek between Parkland Drive and Ingomar Road closed through mid-September for replacement.
Interstate 70, South Strabane -- Eastbound reduced to one lane from Jefferson Avenue (Exit 17) to Murtland Avenue (Exit 19) from 8 p.m. to 7 a.m. nightly through September. No restrictions on Friday and Saturday nights.
Interstate 70, Westmoreland County -- Lane restrictions possible after 8 p.m. Sundays through Thursdays and 10 p.m. Fridays between the Route 43 interchange and New Stanton through mid-September.
Interstate 79, Mercer County -- Single-lane traffic in both directions throughout the 26 miles of highway in the county, with up to three six-mile work zones operating at a time, through October. Work generally suspended weekends but some restrictions may be necessary.
Interstate 79, Neville -- Northbound off-ramp to Grand Avenue closed through mid-September. Detour posted.
Interstate 79, Washington County -- Restricted to one lane in both directions between the Allegheny County line and Canonsburg from 8 p.m. to 6 a.m. Mondays through Thursdays, during pavement improvement project.
Itin Street, Spring Hill -- Closed from High Street to Diana Street around-the-clock until late August during removal of loose rock from hillside at Goehring Street.
Liberty Tunnels -- Outbound tunnel closed nightly from 10 p.m. to 6 a.m. Sundays through Thursdays through Aug. 31. Nightly closures of the inbound tunnel will continue through early December.
Lincoln Way, White Oak -- Bridge over Long Run, between Route 48 (Jacks Run Road) and the east entrance of Oak Park Mall, closed through mid-September for replacement.
Little Sewickley Creek Road, Edgeworth -- Closed through Sept. 7 between Beaver Road and Backbone Road for slope repairs.
Long Road, Penn Hills -- Closed between Beulah Road and Pennywood Drive through Nov. 30 for sewer line installation. Detour via Frankstown Road.
Lovedale Road, Elizabeth Township, Lincoln -- Closed at bridge over branch of Wylie Run near the intersection with Fuehrer Drive continuously through late August during bridge replacement.
Martin Luther King Jr. East Busway -- Closed long-term from Penn Station to Grant Street for repaving. A, B, C stops at Penn Station closed. Riders advised to use other Downtown stops.
Mifflin Road, Hays -- Rehabilitation of two bridges over Baldwin Road shifts traffic into a single lane in each direction on the southbound side through December. Work on southbound side will begin next year.
Milltown Road, Plum -- Closed between Shearer Road and Barnes Road from 8 a.m. to 3 p.m. weekdays starting Wednesday through Aug. 27 for repairs. Detour via Hulton Road, Leechburg Road, Logans Ferry Road and Coxcomb Hill Road.
Montour Church Road, North Fayette -- Bridge over Route 22/30 at the Tonidale interchange closed through late September 2011 for replacement.
Northern Pike, Monroeville -- Alternating one-way traffic controlled by temporary signals at the bridge crossing the Pennsylvania Turnpike through October during deck replacement.
Old William Penn Highway, Monroeville -- Lane closures possible under Parkway East overpasses between Evergreen Drive and Center Road from 9 a.m. to 3 p.m. and 8 p.m. to 5 a.m. daily through Aug. 31.
Parkway East -- Outbound off-ramp at Penn Hills (Exit 81) closed through Aug. 30. Outbound traffic in work zone from Churchill to Pennsylvania Turnpike to be shifted to newly reconstructed right lane and shoulder on Friday, with construction shifting to left lanes. Two lanes open during peak daylight hours, one lane at night. Restrictions continue to mid-December.
Parkway West, Carnegie -- Outbound off-ramp to Carnegie closed 9 a.m. to 3 p.m. weekdays through Aug. 27. Lane restrictions on ramp to Heidelberg.
Parkway West, Robinson -- Lane closures in both directions between Steubenville Pike and Robinson Town Centre from 10 p.m. Thursday to 6 a.m. Friday, weather permitting. All ramps open.
Penn Circle, East Liberty -- Construction starts Monday for one year to make intersection, sidewalk and pavement improvements along Penn Circle South and Penn Circle East between South Highland Avenue and Collins Street to convert to two-way traffic pattern. Lane restrictions in effect during various phases of work.
Pittsburgh International Airport, Findlay -- Arrival ramp to baggage claim area to have single-lane traffic as part of landside roadway repair project that continues to November. Delays possible.
Rankin Bridge -- Alternating one-way traffic from 6 p.m. Tuesday to 6 a.m. Wednesday. Single-lane traffic in both directions at other times through November.
Reedsdale Street, North Side -- Closed eastbound from Tony Dorsett Drive to Allegheny Avenue for about a week for North Shore Connector work.
Route 8, Hampton -- Restricted to one lane in both directions from Harts Run Road to Duncan Avenue through October.
Route 8, Hampton, Shaler -- Resurfacing from south of Butler Plank Road to north of Wildwood Road. Overnight lane restrictions will begin at 7 p.m. Sundays through Thursdays, lasting until 5 the following morning; and from 8 p.m. Fridays to 10 a.m. Saturdays, through late November.
Route 19, North Strabane -- Single-lane traffic in both directions for bridge project at intersection with Route 519.
Route 28, Etna -- Daytime closures of southbound Route 8 and the on-ramp from southbound Route 8 to northbound Route 28 as needed through late August. Northbound traffic restricted around-the-clock to one lane from Shaler Water to new bridge over Route 8; two southbound lanes open in peak periods but left lane closed near Route 8 off-ramp from 9 a.m. to 3 p.m. daily. On-ramp from Butler Street to southbound Route 28 closed. Ramp from northbound Route 28 to northbound Route 8 at Exit 5B closed, with traffic to Sharpsburg, Route 8 and 62nd Street Bridge detoured via Exit 4 at Etna. Restrictions to continue into December.
Route 28, North Side -- Reduced to one lane outbound starting at 9 a.m. Aug. 30 from just north of the 31st Street Bridge through the 40th Street Bridge intersection. Major delays expected. Two lanes of traffic maintained inbound during peak periods. Restrictions in place through mid-summer of 2012 during major reconstruction project. Single-lane traffic and shoulder closures in both directions as needed starting 8 p.m. nightly this week from the old Heinz plant/Chestnut Street overpass through the Millvale interchange for message board and camera installation in advance of Monday's start of major reconstruction. Northbound right lane closed nightly between the 31st Street Bridge and 40th Street Bridge.
Route 30, North Versailles -- Reduced to a single lane in the area of the Greensburg Pike overpass through mid-November during bridge replacement.
Route 50, Carnegie -- Lane closures and traffic shifts possible under Parkway West daily as needed from 6:30 a.m. to 4 p.m. through Friday.
Route 51, Jefferson Hills, Pleasant Hills -- Single-lane traffic in both directions in work zone near Lewis Run Road. No left turns from southbound Route 51 to Lewis Run Road. Lane restrictions from Coal Valley to Lebanon Church/Curry Hollow roads overnight starting 8 p.m. Mondays through Thursdays with some restrictions possible overnight on weekends through October.
Route 65, Avalon -- Reduced to one narrow lane in each direction, with center turn lane open, from the Dilworth Run Bridge to south of Locust Street. Major widening and construction project to continue into November.
Route 65, Emsworth -- Reduced to one narrow lane in each direction between Hiland Avenue and Camp Horne Road through November during replacement of bridge over Lowries Run.
Route 65, Glenfield -- Single-lane traffic in both directions and numerous ramp closures at the Interstate 79 interchange. Temporary northbound off-ramp to Glenfield Viaduct/Kilbuck Street/Interstate 79 closed around-the-clock through Oct. 1. Southbound on-ramp from Kilbuck Street reversed to serve as detour.
Route 65, North Side -- Northbound ramps from Route 65 and Chateau Street to northbound Marshall Avenue closed until late June 2011 for reconstruction.
Route 136, Forward -- Alternating one-way traffic just west of Kelly Hollow Road during bridge replacement around the clock through early November.
Route 910, Harmar, Indiana Township -- Alternating one-way traffic from 8 a.m. to 4 p.m. weekdays between Commerce Park Drive and Saxonburg Boulevard through Aug. 27. Closed westbound between southbound Route 28 on- and off-ramps and Saxonburg Boulevard this weekend and next, from 7 p.m. Friday through 6 a.m. Monday. Revised detour to be posted.
Route 910, Marshall -- Lane closures in both directions weeknights from 7 p.m. to 6 a.m. from just west of Wexford Run Road to just east of Windgate Drive through early September. Some daylight restrictions possible from 9 a.m. to 4 p.m. during widening, repaving, other improvements. Overall work will conclude in November.
Route 910 Gibsonia Road, Richland -- Bridge over Willow Run to reopen Friday evening.
Scott Road, Mt. Lebanon, Dormont -- Lane closures as needed between Castle Shannon Boulevard and Washington Road 9 a.m. to 11 p.m. through Friday during resurfacing.
Spring Garden Road, Reserve -- Closed between Ramage Road and Beech Street for emergency repairs to retaining wall through the end of August.
Squirrel Hill Tunnels -- Single-lane traffic inbound from 10 p.m. Thursday to 5 a.m. Friday.
Streets Run Road, Baldwin Borough -- Closed at intersection with Prospect Road through mid-November for bridge replacement. Streets Run Road and Prospect Road traffic detoured.
Tri-Boro Expressway -- Expressway/Braddock Avenue closed in both directions from O'Connell Boulevard to Cable Avenue for bridge replacement expected to continue into October. Also, East Pittsburgh-McKeesport Boulevard closed from Elder Street to the Tri-Boro Expressway. Main Street under the bridge closed from Braddock Avenue to Bessemer Avenue.
Westinghouse Bridge, North Versailles -- Single-lane traffic in both directions as rehabilitation project continues. Restrictions around-the-clock through September.
West Liberty Avenue, Dormont, Beechview -- Repaving from McFarland Road to Wenzell Avenue to cause lane restrictions at night after 7 p.m. and on weekends through November.
Looking for more from the Post-Gazette? Join PG+, our members-only web site. You'll get exclusive sports content, opinion, financial information, discounts from retailers and restaurants, and more. Our introduction to PG+ gives you all the details.